ADCO - gRIFFITH
Builder: ADCO Constructions
Project: Griffith Hospital
Tower Cranes: Liebherr 280 ECH
RRS is proud to be a part of the
$250m Redevelopment of Griffith Base Hospital with ADCO Constructions as the
principal contractor.
The construction of the Clinical
Services Building required our Liebherr 280ECH Litronic tower crane and
dedicated crane crew.
With a 75m boom length and the
ability to lift 2800kg at maximum radius, our tower crane and crew were able to
deliver to ADCO seamless material handling on this important health project for
the Murrumbidgee Local Health District.
This redevelopment includes an
emergency department, maternity and paediatric services, operating theatres,
surgical and medical inpatient units, medical imaging, and ambulatory and
outpatient services.